A-317249
Permit#
2025-01697
9632 KATELLA AVE
Finaled
2025-04-09 17:16:02 -0700
04/09/2025
09/08/2026
LAN THI PHAM
Remodel
FULL INTERIOR REMODEL MAIN HOUSE FOR (N) KITCHEN, ADD 2BATH, REMODEL (E) 2BATH, LIVING ROOM. REPAIR PART OF THE BACK OF ROOF DUE TO FIRE DAMAGE .REPLACE ELECTRICAL METER, LIGHTING AND OUTLET FOR MAIN HOUSE. REPLACE (E) CENTRAL PACKAGE HVAC W/ HEAT PUMP AC. INSTALL NEW HEAT PUMP WATER HEATER. NEW DRIVE WAY AND CAR APPROACH.
| date | status | requested inspection | assigned to | inspector phone |
|---|---|---|---|---|
| 11/05/2025 | Approved | Electric Service | Aubrey Tull | tel: |
| 11/05/2025 | Approved | Brown Coat | Aubrey Tull | tel: |
| 11/05/2025 | Approved | Underground Conduit | Aubrey Tull | tel: |
| 08/28/2025 | Not Ready | Electric Service | Aubrey Tull | tel: |
| 08/28/2025 | Approved | Shower Lath/Tile Backer | Aubrey Tull | tel: |
| 08/28/2025 | Approved | Shower Pan/Test | Aubrey Tull | tel: |
| 08/12/2025 | Approved | Exterior Lath | Aubrey Tull | tel: |
| 08/12/2025 | Approved | Drywall | Aubrey Tull | tel: |
| 08/05/2025 | Approved | Framing | Aubrey Tull | tel: |
| 08/05/2025 | Approved | Shear Walls/Pre-Wrap | Aubrey Tull | tel: |
| 07/31/2025 | Approved | Insulation | Aubrey Tull | tel: |
| 07/17/2025 | Approved | Rough Mechanical | Luis Mota | tel: |
| 07/17/2025 | Approved | Rough Plumbing | Luis Mota | tel: |
| 07/17/2025 | Partial Pass | Rough Wiring | Luis Mota | tel: |
| 06/30/2025 | Canceled | Electric Service | Aubrey Tull | tel: |
| 06/27/2025 | Not Ready | Rough Wiring | Ryan Dake | +17147415339 |
| 06/09/2025 | Approved | Foundation | Aubrey Tull | tel: |
| 06/09/2025 | Approved | Roof Sheathing | Aubrey Tull | tel: |
| 05/01/2025 | Corrections Required | Foundation | Aubrey Tull | tel: |
| 04/10/2025 | Approved | Plumb Soil Groundwork | Aubrey Tull | tel: |
| 04/10/2025 | Approved | Sewer | Aubrey Tull | tel: |
| 03/12/2026 | Approved | Building Final | Aubrey Tull | tel: |
| 03/12/2026 | Approved | Electrical Final | Aubrey Tull | tel: |
| 03/12/2026 | Approved | Mechanical Final | Aubrey Tull | tel: |
| 03/12/2026 | Approved | Plumbing Final | Aubrey Tull | tel: |
| 03/05/2026 | Corrections Required | Building Final | Aubrey Tull | tel: |
| 02/24/2026 | Corrections Required | Building Final | Aubrey Tull | tel: |